Short Disruptive but Productive Week
Due to the public holiday last Monday, this week was a short week, and a disruptive one due to the rain, 91mm of rain over the last 10 days restricted the type of work carried out. Clean up work included debris removal, 2 felled trees, Bunker repair (washouts etc). This was carried out on top of the usual course set up and we still managed to get through some extra over due works as well. These works included, repair of the 15th wear area, turfing the final section of the 17th green bank modifications, finishing the 16th tee path area and some equipment servicing when the rain was just to heavy for outside work to continue. Considering we are still operating with 3 staff, not a bad effort, a very productive week despite the short disruptive week. Some before and after pics...... 15th wear area 15th repaired 17th green bank before works 17th green bank as it is now 16th tee during wall construction 16th tee now This past week was also the a...