Posts

Showing posts with the label Fairway renovation

Fairway Renovation Pics / Results

Image
The fairway renovations were completed last Wednesday. They were verti cut in 2 directions, scroll cut twice and a huge amount of thatch removed. Over 150 cubic meters of material was removed, the fairways may look ordinary at the moment as warned, however a necessary job as explained previously. We expect a recovery time of 4 to 6 weeks. Fertilising was carried out today, sprinkler trimming and leveling irrigation line furrows will be undertaken during the remainder of this week.  Scarifying 1st Pass  Thatch removed  Cleaning up   1st scroll cut  Finished product 

Front 9 Fwy Renovations

Image
With the fairway in great shape, I keep asking myself why oh why are you still planning on ripping them up and then having a long recovery period before they are back in the same condition ? The answer is the same, if it isn't done, I know through the remainder of summer it will be next to impossible to keep the fairways in the condition they are in now. Why is it that you ask ? The thatch layer I have referred to when talking of the greens renovations is the main culprit and target for the Fairway renovations. Wintergreen Couch is a phenomenal grower and thatches up naturally very quickly, under high maintenance regimes this is more so. Generally at around 15mm to even 20mm is acceptable, any higher and if nothing is done, trouble is just around the corner. Thatch as I have said before is the layer of dead and growing matter between the green leaf and soil, at 15mm or below in depth it is beneficial as it helps out compete weeds and helps retain soil moisture through warme...